OVERVIEW
What started life as an 8-week, £500k interior fit out project, completed as an 18-month, £1.8m external front façade and clock tower restoration project.

The Design Concept
On surveying the building, we established that the front facia was desperately requiring specialist stone restoration in order to preserve this iconic building. Stonemasons co-ordinated the repair of each and every stone of the damaged walls. The clock tower, the buildings focal point and an original masterpiece of engineering, was also professionally restored.
What We Delivered